ASSEMBLY Fast track your Lock Up stage

ASSEMBLY

FAST TRACK CONSTRUCTION

We think of pre-build wall systems construction as a process rather than a product. It’s an alternative project delivery method that begins with producing a fully customised Building Information Model (BIM) to manufacturing fully integrated timber panels offsite under controlled conditions, then transports it to the site location and assemble it on the foundation. To simplify our process, we categorize it with different project stages:

Stage 1

Client Engagement
Site Assessment

Stage 2

Design Assessment

Stage 3

Production
QA

Stage 4

Logistics
On-Site Assembly

Stage 5

Handover